The design and installation of a gas reburn system on a 600 MW coal fired boiler
Conference
·
OSTI ID:427840
- ScottishPower, Glasgow (United Kingdom)
- ScottishPower, Alloa (United Kingdom). Longannet Power Station
A gas reburn system to reduce the emissions of oxides of nitrogen has been installed on a 600 MW coal fired boiler, owned and operated by ScottishPower, to demonstrate the economic and technical viability of the technology. The project has been undertaken by ScottishPower and a number of European Partners. This paper describes the process design which was undertaken by the Partners in the project, the design and installation of the equipment and the planned demonstration program.
- OSTI ID:
- 427840
- Report Number(s):
- CONF-961006--; ISBN 0-7918-1795-4
- Country of Publication:
- United States
- Language:
- English
Similar Records
Longannet unit 2 return to service after gas reburn retrofit
FUEL LEAN BIOMASS REBURNING IN COAL-FIRED BOILERS
Comprehensive report to Congress: Clean Coal Technology program: Demonstration of coal reburning for cyclone boiler NO sub x control
Conference
·
Wed Jul 01 00:00:00 EDT 1998
·
OSTI ID:20050933
FUEL LEAN BIOMASS REBURNING IN COAL-FIRED BOILERS
Technical Report
·
Mon Jul 01 00:00:00 EDT 2002
·
OSTI ID:810443
Comprehensive report to Congress: Clean Coal Technology program: Demonstration of coal reburning for cyclone boiler NO sub x control
Technical Report
·
Wed Jan 31 23:00:00 EST 1990
·
OSTI ID:7170340