SHIELDING REQUIREMENTS FOR THE POWER REACTOR FUEL REPROCESSING PILOT PLANT
Technical Report
·
OSTI ID:4276022
Shielding requirements for the Power Reactor Fuel Reprocessing Pilot Plant were determined as an aid to storage canal and building design. The recommendations are made so that plant personnel will not be exposed to a radiation dose rate in excess of one mr per hour Wring routine plant operation. Fuel assemblies in the storage canal should be covered with 12 ft of water. The dissolver charging machine should be covered with 12 in. of lead. The concrete cell wall should be 5 ft thick. (auth)
- Research Organization:
- Oak Ridge National Lab., Tenn.
- DOE Contract Number:
- W-7405-ENG-26
- NSA Number:
- NSA-13-011684
- OSTI ID:
- 4276022
- Report Number(s):
- CF-58-8-79
- Resource Relation:
- Other Information: Orig. Receipt Date: 31-DEC-59
- Country of Publication:
- United States
- Language:
- English
Similar Records
Decontamination and decommissioning of a fuel reprocessing pilot plant
Total Integrated Dose to Spent Fuel Pool Level Instrument Probes and Refueling Floor Personnel Dose Rates Meeting NRC Order EA-12-051 for a Typical Boiling Water Reactor - Paper 22
Material control for a reprocessing plant
Technical Report
·
Fri Jan 01 00:00:00 EST 1988
·
OSTI ID:4276022
Total Integrated Dose to Spent Fuel Pool Level Instrument Probes and Refueling Floor Personnel Dose Rates Meeting NRC Order EA-12-051 for a Typical Boiling Water Reactor - Paper 22
Conference
·
Mon Sep 15 00:00:00 EDT 2014
·
OSTI ID:4276022
+1 more
Material control for a reprocessing plant
Technical Report
·
Sun Aug 15 00:00:00 EDT 1976
·
OSTI ID:4276022
+6 more