Water resources protection strategy: Revision 1, Attachment 4
The US Department of Energy (DOE) must provide a demonstration of compliance with the final US Environmental Protection Agency (EPA) ground water protection standards for inactive mill sites pursuant to 40 CFR Part 192. This plan outlines the proposed strategy to demonstrate compliance with the ground water standards at the Maybell, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This demonstration consists of (1) the ground water protection standard, (2) a performance assessment, (3) a closure performance demonstration, and (4) a performance monitoring and corrective action program.
- Research Organization:
- Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC04-91AL62350
- OSTI ID:
- 425334
- Report Number(s):
- DOE/AL/62350--24F-REV.1-ATTACH.4; ON: DE97002321
- Country of Publication:
- United States
- Language:
- English
Similar Records
Supplement to the UMTRA Project water sampling and analysis plan, Maybell, Colorado
Gunnison, Colorado subpile study report. Revision 1
Ground water hydrology report: Revision 1, Attachment 3. Final
Technical Report
·
Fri Sep 01 00:00:00 EDT 1995
·
OSTI ID:109649
Gunnison, Colorado subpile study report. Revision 1
Technical Report
·
Mon Aug 01 00:00:00 EDT 1994
·
OSTI ID:10180534
Ground water hydrology report: Revision 1, Attachment 3. Final
Technical Report
·
Sat Nov 30 23:00:00 EST 1996
·
OSTI ID:425333