skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: View Point on the Reduction of Increased Utilization of the High Frequency Power in the Electron Synchrotron. (Especially on the Shortening of the Acceleration Time); GESICHTSPUNKTE ZUR VERRINGERUNG ODER BESSEREN AUSNUTZUNG DER HOCHFREQUENZLEISTUNG BEIM ELEKTRONEN-SYCHROTRON. (INSBES, UBER DIE ABKURZUNG DER RELATIVEN BESCHLEUNIGUNGSZEIT

Technical Report ·
OSTI ID:4252268

The cost of the high-frequency plant is a principal item in the total construction and operating costs of a 6-Bev electron synchrotron. It is therefore advantageous to define those parameters of the machine which have an effect on the magnitude of the necessary h-f power so that the operation and construction of the accelerator is possible with the lowest cost. With this aim, the general dependence of the h-f power on the pulse repetition frequency, conditions of pulse lnput and cutoff time, and length of the acceleration gap or magnitude of the average field strength is discussed. (J.S.R.)

Research Organization:
Deutsches Elektronen-Synchrotron, Hamburg
NSA Number:
NSA-13-019372
OSTI ID:
4252268
Report Number(s):
DESY-A2.6
Resource Relation:
Other Information: Orig. Receipt Date: 31-DEC-59
Country of Publication:
Germany
Language:
English