HEAVY WATER MODERATED POWER REACTOR PLANT. PART 1. DESIGN STUDY. PART 2. PRELIMINARY DESIGN OF THE PROTOTYPE PLANT
Technical Report
·
OSTI ID:4237178
The full-scale plant recommended as a result of a study of six D/sub 2/O moderated concepts utilizes a direct cycle, boiling D/sub 2/O reactor-turbine system to produce 208 Mw(e) net output. D/sub 2/O steam is produced in the tubes of a pressure tube type reactor. Power production costs are 12.609 and 11.181 mills/kwh for natural and enriched uranium. A preliminary design of a 65 Mw(e) prototype plant is presented. (W.D.M.)
- Research Organization:
- Sargent and Lundy, Chicago; Nuclear Development Corp. of America, White Plains, N.Y.
- DOE Contract Number:
- AT(38-1)-193
- NSA Number:
- NSA-13-020734
- OSTI ID:
- 4237178
- Report Number(s):
- TID-8503
- Resource Relation:
- Other Information: Issued in two parts; Pts. 1 and 2 previously available as SL-1565(Vols. 1-3 and Add. 1) and SL-1581(Vols. 1-3), respectively. Orig. Receipt Date: 31-DEC-59
- Country of Publication:
- United States
- Language:
- English
Similar Records
HEAVY-WATER-MODERATED POWER REACTORS. A Status Report
HEAVY-WATER-MODERATED POWER REACTORS ENGINEERING AND ECONOMIC EVALUATIONS. VOLUME I. SUMMARY REPORT
CIVILIAN POWER REACTOR PROGRAM. PART III. STATUS REPORT ON LARGE (100 AND 300 MWe) HEAVY WATER-MODERATED POWER REACTORS--AS OF 1960
Technical Report
·
Tue Mar 01 00:00:00 EST 1960
·
OSTI ID:4237178
+1 more
HEAVY-WATER-MODERATED POWER REACTORS ENGINEERING AND ECONOMIC EVALUATIONS. VOLUME I. SUMMARY REPORT
Technical Report
·
Wed Jun 01 00:00:00 EDT 1960
·
OSTI ID:4237178
CIVILIAN POWER REACTOR PROGRAM. PART III. STATUS REPORT ON LARGE (100 AND 300 MWe) HEAVY WATER-MODERATED POWER REACTORS--AS OF 1960
Technical Report
·
Fri Aug 19 00:00:00 EDT 1960
·
OSTI ID:4237178
+1 more