Experience in float over integrated deck -- Design and installation
Conference
·
OSTI ID:423150
Since early 1980, Technip-Geoproduction (TPG), as designer or as installation contractor, has been using with success the float over system UNIDECK-TPG for the transportation and installation of integrated decks for offshore platforms. The concept offers the advantages of significant savings in transportation and installation cost by minimizing the installation time and offshore hook-up and eliminating the need for a heavy lift derrick barge. The paper describes the technology used for the installation, the required engineering studies, the consequences of using such a concept on platform design and the selection of an appropriate barge size to be used.
- OSTI ID:
- 423150
- Report Number(s):
- CONF-960525--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Integrated, float-over deck design considerations
Smart.Leg: A new method for heavy deck offshore installation
Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:423148
Smart.Leg: A new method for heavy deck offshore installation
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:423149
Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations
Patent
·
Mon Dec 21 23:00:00 EST 1987
·
OSTI ID:5451868