Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

A THROUGH-ROOF HOIST FOR REMOTE MAINTENANCE OF HOT-CELL LIGHTS IN THE PROCESSING REFABRICATION EXPERIMENT

Technical Report ·
DOI:https://doi.org/10.2172/4220873· OSTI ID:4220873
As part of the Processing Refabrication Experiment (PRE) a facility was designed to demonstrate the remote processing of short-cooled nuclear fuels which had been irradiated to power reactor levels. The Luminaire assembly, which was developed and operated as part of the PRE to meet these needs, consists of a 3-kw lamp located along the longitudinal axis of the parabolic surface of a reflector- type heat exchanger. The insulated electrical and coolant lines pass through a precisely surfaced through-roof conduit to the utility supply outside the cell. The throughroof conduit is tubular, filled with magnesia and steel shot shielding materials, and sealed to the installation housing by a primary in-cell seal and secondary outof-cell seals. The conduit is supported by both an out-of-cell lock nut which also serves to compress the in-cell gasket-seal during lamp operations and extension rods suspended from an out-of-cell hoist during luminaire maintenance operation. The through-roof conduit, extension rods, and hoist perform ss a rigidarm crane to lower luminaire assemblies for in-cell maintenance. With the luminaire assembly replaced by a special hook attachment, items such as top-riding hoists, manipulators, and associated bridges could be lowered in the cell for maintenance. The technical oonsiderations affecting design and an evaluation of operational and maintenance procedures are presented. (auth)
Research Organization:
Atomics International Div., North American Aviation, Inc., Canoga Park, Calif.
Sponsoring Organization:
US Atomic Energy Commission (AEC)
DOE Contract Number:
AT(11-1)-GEN-8
NSA Number:
NSA-13-021083
OSTI ID:
4220873
Report Number(s):
NAA-SR-2983
Country of Publication:
United States
Language:
English

Similar Records

A Remotely Maintainable Rectilinear Manipulator for the Processing Refabrication Experiment (PRE)
Technical Report · Sat Mar 14 23:00:00 EST 1959 · OSTI ID:4252563

Hoisting and rigging manual: Uncontrolled document
Technical Report · Wed May 01 00:00:00 EDT 1991 · OSTI ID:451181

Development of processes and equipment for the refabrication of HTGR fuels
Technical Report · Tue Jun 01 00:00:00 EDT 1976 · OSTI ID:7362006