PLANT MODIFICATIONS FOR REPROCESSING NON-PRODUCTION REACTOR FUELS. DESIGN CRITERIA FOR FUEL ELEMENT STORAGE FACILITY, BUILDING 221-1

Technical Report ·
OSTI ID:4216865
The design of facilities is reported for removing fuel elements from the casks and moving the elements to mcdified existing 10 ft by 16 ft by 14 ft storage tanks where they will be stored until scheduled for processing. Each storage tank is equipped with a storage rack for storing elements as received in a sub-critical array, two air-lift circulators for agitation to improve heat transfer and tank cleading, and jumpers. Additionul facilities are provided in one cell only for measuring the volume and inlet and cutlet temperatures of the cooling water for technical information. All handling of the elements in their respective baskets will be accomplished by use of the existing 75-ton overhead remote crane. Provisions are also provided for the major decontamination of the casks in the rallroad tunnel prior to their removal. (W.L.H.)
Research Organization:
General Electric Co. Hanford Atomic Products Operation, Richland, Wash.
DOE Contract Number:
AT(45-1)-1350
NSA Number:
NSA-14-005255
OSTI ID:
4216865
Report Number(s):
HW-61510; Project CGC-830
Country of Publication:
United States
Language:
English

Similar Records

Conversion of the chemical process cell at West Valley to a high-level-waste storage facility
Conference · Tue Oct 31 23:00:00 EST 1989 · Transactions of the American Nuclear Society; (United States) · OSTI ID:5431128

PROJECT CGC-830 PLANT MODIFICATIONS FOR REPROCESSING NON-PRODUCTION REACTOR FUELS. DESIGN CRITERIA FOR METAL SOLUTION STORAGE
Technical Report · Tue Apr 26 00:00:00 EDT 1960 · OSTI ID:4005881

Hazards classification determination for PUREX fuel transfer to K-Basins
Technical Report · Thu Apr 13 00:00:00 EDT 1995 · OSTI ID:52762