Preliminary Estimated Building Costs of the HF for 6 Bev. (In 1000 DM); VORLAUFIG GESCHATZTE BAUKOSTEN DER HF FUR 6 GeV (IN 1000 DM)
Technical Report
·
OSTI ID:4205645
A preliminary estimate of the construction and operating costs of the high-frequency system for the Hamburg Electron Synchrotron is presented and compared with the construction costs for the CEA proton synchrotron. The synchrotron parameters on which the estimate is based are tabulated. (J.S.R.)
- Research Organization:
- Deutsches Elektronen-Synchrotron, Hamburg
- NSA Number:
- NSA-13-020294
- OSTI ID:
- 4205645
- Report Number(s):
- NP-7820
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
Cost of the DESY Buildings and their Construction; KOSTEN DER DESY-BAUTEILE UND IHRES AUFBAUES
Establishment of the Average Radius and the Basic Parameter Connected with it for Desy; FESTLEGUNG DES MITTLEREN RADIUS UND DER DAMIT VERBUNDENEN GRUNDPARAMETER FUR DESY
Comparison of Some Critical Parameters for the CERN, CEA, and DESY Machines; VERGLEICH EINIGER KRITISCHER PARAMETER FUR DIE MASCHINEN CERN, CEA UND DESY
Technical Report
·
Mon Apr 16 23:00:00 EST 1962
·
OSTI ID:4784129
Establishment of the Average Radius and the Basic Parameter Connected with it for Desy; FESTLEGUNG DES MITTLEREN RADIUS UND DER DAMIT VERBUNDENEN GRUNDPARAMETER FUR DESY
Technical Report
·
Thu May 01 00:00:00 EDT 1958
·
OSTI ID:4226096
Comparison of Some Critical Parameters for the CERN, CEA, and DESY Machines; VERGLEICH EINIGER KRITISCHER PARAMETER FUR DIE MASCHINEN CERN, CEA UND DESY
Technical Report
·
Sat Nov 30 23:00:00 EST 1957
·
OSTI ID:4217227