Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Preliminary Estimated Building Costs of the HF for 6 Bev. (In 1000 DM); VORLAUFIG GESCHATZTE BAUKOSTEN DER HF FUR 6 GeV (IN 1000 DM)

Technical Report ·
OSTI ID:4205645
A preliminary estimate of the construction and operating costs of the high-frequency system for the Hamburg Electron Synchrotron is presented and compared with the construction costs for the CEA proton synchrotron. The synchrotron parameters on which the estimate is based are tabulated. (J.S.R.)
Research Organization:
Deutsches Elektronen-Synchrotron, Hamburg
NSA Number:
NSA-13-020294
OSTI ID:
4205645
Report Number(s):
NP-7820
Country of Publication:
Country unknown/Code not available
Language:
English