ERDL-NPFO--QUARTERLY PROGRESS REPORT NO. 10 FOR OCTOBER THROUGH DECEMBER 1959
Technical Report
·
OSTI ID:4196074
The corrosion loop operated at 90% utilization during this quarter. MOD SG-5 and SH-5 (Croloy 16-1) were removed from the loop after 4253 hours of testing without failure. MOD Sr-6 and SH-6 (Inconel) were removed after 3819 hours of testing. Testing of MIN-6 (Croloy 16-1) war terminated after 2767 hours. Testing of MIN-8 (Inconel) was terminated after 5296 hours. Post-test evaluation was completed on MIN-4, MIN-5 (Croloy 16-1) and MIN-9 (Inconel). Very little corrosion product was noted in the secondary of the Inconel vessel. Engineering design was imtiated on modifications to the corrosion loop. (For preceding period see MND-E-2007.) (auth)
- Research Organization:
- Martin Co. Nuclear Div., Baltimore
- NSA Number:
- NSA-14-011928
- OSTI ID:
- 4196074
- Report Number(s):
- MND-E-2008
- Country of Publication:
- United States
- Language:
- English
Similar Records
ERDL-NPFO--CORROSION TESTING OF INCONEL AND CROLOY 16-1 HEAT EXCHANGERS
ERDL-NPFO--QUARTERLY PROGRESS REPORT NO. 9. FOR JULY THROUGH SEPTEMBER 1959
ERDL-NPFO. QUARTERLY PROGRESS REPORT NO. 13
Technical Report
·
Mon Feb 29 23:00:00 EST 1960
·
OSTI ID:4180721
ERDL-NPFO--QUARTERLY PROGRESS REPORT NO. 9. FOR JULY THROUGH SEPTEMBER 1959
Technical Report
·
Thu Oct 01 00:00:00 EDT 1959
·
OSTI ID:4234878
ERDL-NPFO. QUARTERLY PROGRESS REPORT NO. 13
Technical Report
·
Sat Oct 01 00:00:00 EDT 1960
·
OSTI ID:4115782