PIQUA PROTOTYPE HANDLING SYSTEM
Technical Report
·
OSTI ID:4185336
Equipment has been developed to handle the fuel elements and control rods for the Piqua (OMR) Reactor. With the handling machine. which consists of a shielded cask mounted on a gantry, a fuel element can be replaced in the core in about 27 minutes. To shift from fuel element to control rod handling takes about 30 minutes. Functional simplicity and reliability high-light the performance of this handling system. (auth)
- Research Organization:
- Atomics International Div., North American Aviation, Inc., Canoga Park, Calif.
- DOE Contract Number:
- AT(11-1)-GEN-8
- NSA Number:
- NSA-14-015457
- OSTI ID:
- 4185336
- Report Number(s):
- NAA-SR-4361
- Country of Publication:
- United States
- Language:
- English
Similar Records
OPERATION OF THE PIQUA OMR DEGASIFICATION SYSTEM PROTOTYPE
A REVIEW OF THE RECOIL ACTIVITY PROBLEM IN THE COOLANT OF THE PIQUA OMR
SINGLE ELEMENT SHIPPING CASK FOR PNPF, OMRE, AND EOCR IRRADIATED FUEL ELEMENTS
Technical Report
·
Tue Aug 30 00:00:00 EDT 1960
·
OSTI ID:4146344
A REVIEW OF THE RECOIL ACTIVITY PROBLEM IN THE COOLANT OF THE PIQUA OMR
Technical Report
·
Fri Jun 12 00:00:00 EDT 1959
·
OSTI ID:4226527
SINGLE ELEMENT SHIPPING CASK FOR PNPF, OMRE, AND EOCR IRRADIATED FUEL ELEMENTS
Technical Report
·
Sat Jun 01 00:00:00 EDT 1963
·
OSTI ID:4684948