PERIODIC RADIATION SURVEY OF REACTOR PLANT CONTAINER AND COMPONENTS AFTER SHUTDOWN "C" SURVEY. SECTION III, 5735.8 EFPH. FIFTH PERFORMANCE. CORE 1, SEED 1. Test Results DL-S-184 (T-612076)
Technical Report
·
OSTI ID:4176766
Tests were conducted to assay the changes in radiation level in the PWR purification system 1BD Hairpin Loop resulting from continued operation of the reactor at power. It was found that the radiation in this component decays to a tolerable level one minute after isolation of the loop; prior to isolation the radiation level was 250 to 300 mr/hr. (J.R.D.)
- Research Organization:
- Duquesne Light Co., Shippingport, Penna.
- NSA Number:
- NSA-14-011316
- OSTI ID:
- 4176766
- Report Number(s):
- TID-5616
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
PERIODIC RADIATION SURVEY OF REACTOR PLANT CONTAINER AND COMPONENTS AFTER SHUTDOWN "E" SURVEY. CORE I, SEED 1. TEST RESULTS DLCS-1840303 (T-612076)
PERIODIC RADIATION SURVEY OF REACTOR PLANT CONTAINER AND COMPONENTS AFTER SHUTDOWN, "I" SURVEY. CORE 1, SEED 1. Section 2. Test Results T-612076
RADIATION SURVEY OF REACTOR PLANT CONTAINERS AND COMPONENTS AFTER SHUTDOWN "D" SURVEY. SECTION III. FIRST PERFORMANCE. CORE 1, SEED 1. Test Results DL-S-184 (T-612076)
Technical Report
·
Sun May 01 00:00:00 EDT 1960
·
OSTI ID:4199739
PERIODIC RADIATION SURVEY OF REACTOR PLANT CONTAINER AND COMPONENTS AFTER SHUTDOWN, "I" SURVEY. CORE 1, SEED 1. Section 2. Test Results T-612076
Technical Report
·
Mon Oct 17 00:00:00 EDT 1960
·
OSTI ID:4065389
RADIATION SURVEY OF REACTOR PLANT CONTAINERS AND COMPONENTS AFTER SHUTDOWN "D" SURVEY. SECTION III. FIRST PERFORMANCE. CORE 1, SEED 1. Test Results DL-S-184 (T-612076)
Technical Report
·
Wed Dec 30 23:00:00 EST 1959
·
OSTI ID:4200343