SHIELDING OF DEMINERALIZERS AND FILTERS IN THE HFIR PRIMARY COOLANT SYSTEM
S> Thicknesses of ordinary concrete required to shield the demineralizers and filters in the HFIR primary water system were computed for normal operating conditions and for abnormal conditions such as a meltdown of the fuel within the reactor. About 4 1/2 ft, 3 1/4 ft, and 4 1/4 ft of concrete are required to shield the cation exchange unit, the anion exchange unit, and the filter unit, respectively, to the most stringent of the following radiation levels: (a) 0.75 mr/hr for normal reactor operation or reactor operation with one defective fuel plate; (b) 1 r/hr immediately following the meltdown of 1% of the fuel; and (c) 1 r/hr 24 hours following a total fuel meltdown. Shielding thicknesses may be estimated for other tolerances from
- Research Organization:
- Oak Ridge National Lab., Tenn. (US)
- Sponsoring Organization:
- US Atomic Energy Commission (AEC)
- DOE Contract Number:
- W-7405-ENG-26
- NSA Number:
- NSA-14-022526
- OSTI ID:
- 4156058
- Report Number(s):
- CF-60-7-53
- Country of Publication:
- United States
- Language:
- English
Similar Records
SHIELDING OF PIPES IN THE HFIR PRIMARY COOLANT SYSTEM
SHIELDING OF THE HFIR PRIMARY COOLANT DEAERATOR AND CONDENSERS
ACTIVITY IN THE HFIR PRIMARY COOLANT SYSTEM AFTER A MELTDOWN OF THE FUEL IN REACTOR
Technical Report
·
Thu Jun 30 00:00:00 EDT 1960
·
OSTI ID:4164200
SHIELDING OF THE HFIR PRIMARY COOLANT DEAERATOR AND CONDENSERS
Technical Report
·
Fri Jun 16 00:00:00 EDT 1961
·
OSTI ID:4014979
ACTIVITY IN THE HFIR PRIMARY COOLANT SYSTEM AFTER A MELTDOWN OF THE FUEL IN REACTOR
Technical Report
·
Fri Jun 10 00:00:00 EDT 1960
·
OSTI ID:4170895