SHIELDING OF DEMINERALIZERS AND FILTERS IN THE HFIR PRIMARY COOLANT SYSTEM

Technical Report ·
DOI:https://doi.org/10.2172/4156058· OSTI ID:4156058
S> Thicknesses of ordinary concrete required to shield the demineralizers and filters in the HFIR primary water system were computed for normal operating conditions and for abnormal conditions such as a meltdown of the fuel within the reactor. About 4 1/2 ft, 3 1/4 ft, and 4 1/4 ft of concrete are required to shield the cation exchange unit, the anion exchange unit, and the filter unit, respectively, to the most stringent of the following radiation levels: (a) 0.75 mr/hr for normal reactor operation or reactor operation with one defective fuel plate; (b) 1 r/hr immediately following the meltdown of 1% of the fuel; and (c) 1 r/hr 24 hours following a total fuel meltdown. Shielding thicknesses may be estimated for other tolerances from
Research Organization:
Oak Ridge National Lab., Tenn. (US)
Sponsoring Organization:
US Atomic Energy Commission (AEC)
DOE Contract Number:
W-7405-ENG-26
NSA Number:
NSA-14-022526
OSTI ID:
4156058
Report Number(s):
CF-60-7-53
Country of Publication:
United States
Language:
English