Consortium for coal log pipeline research and development. Final technical progress report, August 10, 1993--August 9, 1996
The main objective of this project was to conduct intensive research and development of the Coal Log Pipeline (CLP). Specifically, the R & D was to concentrate on previously neglected and insufficiently studied aspects of CLP which were deemed significant. With improvements in these areas, CLP could be implemented for commercial use within five years. CLP technology is capable of transporting coal logs for long distances. The many potential advantages of CLP over truck and railroad transportation include: lower freight costs, less energy consumption, less air pollution, decreased environmental problems, increased safety, and improved reliability. Previous studies have shown that CLP is advantageous over slurry pipeline technology. First, CLP uses one-third the water required by a coal slurry pipeline. Second, CLP provides easier coal dewatering. Third, the CLP conveying capacity of coal is twice as much as a slurry transport line of equal diameter. In many situations, the cost for transporting each ton of coal is expected to be less expensive by CLP as compared to other competing modes of transportation such as: truck, unit train and slurry pipeline.
- Research Organization:
- Missouri Univ., Columbia, MO (United States). Capsule Pipeline Research Center
- Sponsoring Organization:
- USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
- DOE Contract Number:
- FC22-93PC92578
- OSTI ID:
- 415346
- Report Number(s):
- DOE/PC/92578--T14; ON: DE97050489
- Country of Publication:
- United States
- Language:
- English
Similar Records
A technical and economic assessment of coal log pipeline technology at electric power generating plants
Coal log pipeline: Development status of the first commercial system
Capsule Pipeline Research Center. 3-year Progress report, September 1, 1993--August 31, 1994
Conference
·
Thu Dec 30 23:00:00 EST 1993
·
OSTI ID:45138
Coal log pipeline: Development status of the first commercial system
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:430509
Capsule Pipeline Research Center. 3-year Progress report, September 1, 1993--August 31, 1994
Technical Report
·
Thu Mar 31 23:00:00 EST 1994
·
OSTI ID:10102414