RECOVERY OF PLUTONIUM FROM CHLORIDE SLAG AND CRUCIBLE
Technical Report
·
OSTI ID:4151933
Flowsheets outlining the recovery of Pu from chloride slag and crucible were developed. Chloride is reduced to 35 ppm. The method is adaptable to recovery of other Pubearing salts such as those obtained in the electrolytic reduction of Pu or Pu refining in fused-salt baths. (J.R.D.)
- Research Organization:
- General Electric Co. Hanford Atomic Products Operation, Richland, Wash.
- DOE Contract Number:
- AT(45-1)-1350
- NSA Number:
- NSA-14-024189
- OSTI ID:
- 4151933
- Report Number(s):
- HW-61577
- Country of Publication:
- United States
- Language:
- English
Similar Records
PRECIPITATION METHOD FOR THE RECOVERY OF PLUTONIUM FROM CHLORIDE SLAG AND CRUCIBLE--PROGRESS REPORT
ANION EXCHANGE RECOVERY OF PLUTONIUM FROM REDUCTION RESIDUES
RECOVERY OF PLUTONIUM FROM SLAG AND CRUCIBLE
Technical Report
·
Wed Oct 29 23:00:00 EST 1958
·
OSTI ID:4155890
ANION EXCHANGE RECOVERY OF PLUTONIUM FROM REDUCTION RESIDUES
Technical Report
·
Sun Jan 31 23:00:00 EST 1960
·
OSTI ID:4713230
RECOVERY OF PLUTONIUM FROM SLAG AND CRUCIBLE
Technical Report
·
Fri Jun 15 00:00:00 EDT 1951
·
OSTI ID:4015502