Maximising Longwall performance and profitability by the introduction of moving car bunker systems into outbye haulage layouts
Conference
·
OSTI ID:414943
In order to maximize the profitability of Longwall mining operations, outbye materials handling systems should be cost effectively engineered to both fully harmonize with cyclical surges in output and to maintain high levels of availability. With the introduction of new Longwall systems into existing mines, the upgrading of outbye haulage to handle peak production from the Longwall panel can prove to be extremely expensive and is often unnecessary. In addition, despite high levels of investment in new equipment, many mines are still failing to achieve planned gains in Longwall productivity due to persistent downtime on outbye haulage routes. This paper details the planning, production and engineering considerations necessary to maximize profitability by the introduction of moving car bunker systems to underground haulage layouts. It also examines case studies of recent installations within the North American coal mining industry and charts the significant success being achieved in improving profitability at these mines.
- OSTI ID:
- 414943
- Report Number(s):
- CONF-960663--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Stochastic modeling of mine conveyor/bunker systems
Automatic haulage system for Poland's Staszic mine
In focus: Underground haulage
Thesis/Dissertation
·
Wed Dec 31 23:00:00 EST 1986
·
OSTI ID:5499975
Automatic haulage system for Poland's Staszic mine
Journal Article
·
Mon May 01 00:00:00 EDT 1978
· World Coal; (United States)
·
OSTI ID:5029176
In focus: Underground haulage
Journal Article
·
Sat Oct 01 00:00:00 EDT 1994
· World Mining Equipment; (United States)
·
OSTI ID:6918885