skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Project Rio Blanco. Part II. Production test data and preliminary analysis of top chimney/cavity

Conference ·
OSTI ID:4133829

The reentry drilling established communication with the top Rio Blanco detonation region at a depth of 1704 m, or about 76 m above the top detonation center. A total of 2.8 x 10$sup 6$ m$sup 3$ (97 x 10$sup 6$ ft$sup 3$) of dry gas at standard conditions has now been produced during two separate test periods. Radioactive and chemical analysis of this gas and the modeling of the stimulated reservoir shows the following main results: no permeable connection exists between the top and the middle detonation regions, since none of the tracer incorporated in the center explosive canister was detected in the gas produced. As a consequence, results for the top detonation region only are available at this time; the initial cavity radius is deduced to be 20 m (66 ft), or well within expectations; integration of the $sup 85$Kr produced indicates a yield of 34 +- 3 kt for the top explosive; of the approximately 1000 Ci of tritium produced in the top explosion region, about 5 percent is incorporated in the gas phase; pressure draw-down and build-up data are best reproduced by a two-layer reservoir model showing stimulated permeabilities about 10 and 30 times original formation permeabilities, and extending to a distance of about three cavity radii from the well bore; and the capacity of the reservoir intercepted by the top explosive is deduced to be about 0.2 mdarcy . m (0.73 mdarcy . ft), as contrasted with preshot estimates ranging from 1.3 to 2.3 mdarcy . m (4.1 - 7.6 mdarcy . ft). The reason for this discrepancy is not resolved at this time. Additional subsurface investigations of the other detonation regions as well as a reevaluation of the initial reservoir properties are in progress. (auth)

Research Organization:
Univ. of California, Livermore
NSA Number:
NSA-33-009228
OSTI ID:
4133829
Resource Relation:
Conference: 4. IAEA panel on peaceful nuclear explosives, Vienna, Austria, 20 Jan 1975; Other Information: See STI/PUB--414; CONF-750109--. Orig. Receipt Date: 30-JUN-76; Related Information: Peaceful nuclear explosions. IV
Country of Publication:
IAEA
Language:
English

Similar Records

Production test data and preliminary analysis of top chimney/cavity
Journal Article · Mon Dec 01 00:00:00 EST 1975 · Nucl. Technol., v. 27, no. 4, pp. 692-704 · OSTI ID:4133829

Project Rio Blanco: additional production testing and reservoir analysis
Conference · Mon Nov 01 00:00:00 EST 1976 · OSTI ID:4133829

Rio Blanco experiment: its objectives, design, and execution
Journal Article · Mon Dec 01 00:00:00 EST 1975 · Nucl. Technol., v. 27, no. 4, pp. 539-558 · OSTI ID:4133829