Increased reliability and optimized operation: a necessity in power station engineering. II. Measures (in German)
Journal Article
·
· Brennst.-Waerme-Kraft, v. 27, no. 6, pp. 247-251
OSTI ID:4129652
Following the analysis made in Part 1, this part is dealing with the measures for improvements, e.g. the introduction of theoretical methods, the improvement of testing technics and methodology, and the application of ergonomic knowledge. (orig.)
- Research Organization:
- Technischer Ueberwachungs-Verein Rheinland e.V., Koeln (F.R. Germany)); (Technischer Ueberwachungs-Verein Rheinland e.V., Koeln (F.R. Germany). Abt. Grosskraftwerke
- NSA Number:
- NSA-33-011381
- OSTI ID:
- 4129652
- Journal Information:
- Brennst.-Waerme-Kraft, v. 27, no. 6, pp. 247-251, Other Information: 9 figs.; 1 tab. Orig. Receipt Date: 30-JUN-76
- Country of Publication:
- Germany
- Language:
- German
Similar Records
Human Factors for Situation Assessment in Grid Operations
Development and testing of improved statistical wind power forecasting methods.
Techno-Economic Analysis of Indian Draft Standard Levels for RoomAir Conditioners
Technical Report
·
Wed Aug 08 00:00:00 EDT 2007
·
OSTI ID:4129652
+1 more
Development and testing of improved statistical wind power forecasting methods.
Technical Report
·
Tue Dec 06 00:00:00 EST 2011
·
OSTI ID:4129652
+7 more
Techno-Economic Analysis of Indian Draft Standard Levels for RoomAir Conditioners
Technical Report
·
Thu Mar 01 00:00:00 EST 2007
·
OSTI ID:4129652