TRAINING OF CONSUMERS PUBLIC POWER DISTRICT PERSONNEL FOR THE OPERATION OF THE HALLAM NUCLEAR POWER FACILITY

Technical Report ·
DOI:https://doi.org/10.2172/4129201· OSTI ID:4129201
Sheldon Station employees of the Consumers Public Power District (CPPD) attended a formalized training program on the HNPF during 1960 while the facility was under construction. The program was conducted and developed by Atomics International and was of six months duration. Total instruction time for this program was approximately 900 hours. Thirty CPPD personnel attended. A second HNPF training program for CPPD personnel was initiated by Al in September 1961. This program was primarily intended to train HNPF reactor operators. After completion of the training program, trainees took AEC reactor operator license examinations. This program was carried out in three sessions. The first session began in September 1961, and the third session was completed in February 1963. Thirty CPPD and 22 Al personnel were trained and, after passing the AEC examinations, received HNPF reactor operator licenses. The two formalized HNPF training programs were entirely independent of on-the-job training activities. These activities have been extensive. The conventional portion of Sheldon Station has been a commercial power plant since July 1, 1961. All station operating personnel are thoroughly familiar with conventional power plant operation. Most operating personnel had considerable conventional power plant experience prior to employment at Sheldon Station; those who did not were trained in power plant operation by CPPD management. All shift operating personnel have been regularly rotated between conventional and nuclear sides of the facility and are, as a result of experience, familiar with both. Sheldon Station CPPD personnel were utilized extensively as instructors for the two formalized RNPF training programs and as responsible engineers for numerous tests of the HNPF. CPPD shift personnel constiuted the principal operating force throughout HNPF construction, reactor startup, and testing. (auth)
Research Organization:
Atomics International. Div. of North American Aviation, Inc., Canoga Park, Calif.
DOE Contract Number:
AT(11-1)-GEN-8
NSA Number:
NSA-18-006484
OSTI ID:
4129201
Report Number(s):
CONF-243-37
Country of Publication:
United States
Language:
English

Similar Records

OPERATING EXPERIENCE WITH THE SODIUM REACTOR EXPERIMENT AND ITS APPLICATION TO THE HALLAM NUCLEAR POWER FACILITY
Technical Report · Thu Dec 31 23:00:00 EST 1959 · OSTI ID:4054625

ADDITIONAL INFORMATION ON DRY, ZERO-POWER EXPERIMENTS IN HNPF
Technical Report · Fri Sep 01 00:00:00 EDT 1961 · OSTI ID:4810306

Design and operation of a virtual reality operator-training system
Journal Article · Thu Aug 01 00:00:00 EDT 1996 · IEEE Transactions on Power Systems · OSTI ID:390039