skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: FEASIBILITY STUDY OF A NEW MASS FLOW SYSTEM. Quarterly Report No. 2 Covering the Period from September 1 to November 30, 1960

Abstract

Activities in a development program for a mass flow system capable of measuring homogeneous flow, slurries, highly corrosive fluids, and multiphase fluids are reported. The first experimental mass flow meter is nearly complete, and the required intensity of the radioactive source for mass measurements is being determined. Design of the vibrating reeds for the sources are completed. Absorption measurements at energies <100 kev indicate that composition effects are present, however, the effect is not considered serious since the system can be calibrated for each particular material. (J.R.D.)

Authors:
Publication Date:
Research Org.:
Illinois Inst. of Tech., Chicago. Armour Research Foundation
OSTI Identifier:
4101784
Report Number(s):
ARF-1167-6
NSA Number:
NSA-15-008944
DOE Contract Number:
AT(11-1)-578
Resource Type:
Technical Report
Resource Relation:
Other Information: Includes Quarterly Report No. 6, Period from September 1-November 30, 1960. William K. Genthe (Badger Meter Mfg. Co., Milwaukee). Orig. Receipt Date: 31-DEC-61
Country of Publication:
United States
Language:
English
Subject:
ENGINEERING AND EQUIPMENT; ABSORPTION; CORROSION; EFFICIENCY; ENERGY LEVELS; FLOWMETERS; FLUID FLOW; FLUIDS; MASS; MEASURED VALUES; PLANNING; QUANTITATIVE ANALYSIS; RADIATION DOSES; RADIATION SOURCES; RECORDING SYSTEMS; SLURRIES; STABILITY; STANDARDS; VIBRATIONS

Citation Formats

Burgwald, G.M. FEASIBILITY STUDY OF A NEW MASS FLOW SYSTEM. Quarterly Report No. 2 Covering the Period from September 1 to November 30, 1960. United States: N. p., 1960. Web. doi:10.2172/4101784.
Burgwald, G.M. FEASIBILITY STUDY OF A NEW MASS FLOW SYSTEM. Quarterly Report No. 2 Covering the Period from September 1 to November 30, 1960. United States. doi:10.2172/4101784.
Burgwald, G.M. Mon . "FEASIBILITY STUDY OF A NEW MASS FLOW SYSTEM. Quarterly Report No. 2 Covering the Period from September 1 to November 30, 1960". United States. doi:10.2172/4101784. https://www.osti.gov/servlets/purl/4101784.
@article{osti_4101784,
title = {FEASIBILITY STUDY OF A NEW MASS FLOW SYSTEM. Quarterly Report No. 2 Covering the Period from September 1 to November 30, 1960},
author = {Burgwald, G.M.},
abstractNote = {Activities in a development program for a mass flow system capable of measuring homogeneous flow, slurries, highly corrosive fluids, and multiphase fluids are reported. The first experimental mass flow meter is nearly complete, and the required intensity of the radioactive source for mass measurements is being determined. Design of the vibrating reeds for the sources are completed. Absorption measurements at energies <100 kev indicate that composition effects are present, however, the effect is not considered serious since the system can be calibrated for each particular material. (J.R.D.)},
doi = {10.2172/4101784},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Dec 19 00:00:00 EST 1960},
month = {Mon Dec 19 00:00:00 EST 1960}
}

Technical Report:

Save / Share: