Analysis and results of pulsed-neutron experiments performed on the Fort St. Vrain high-temperature gas-cooled reactor
Journal Article
·
· Nucl. Technol., v. 27, no. 3, pp. 352-375
OSTI ID:4078459
Pulsed-neutron experiments were performed on the Fort St. Vrain reactor to determine the reactivity of the core for various control rod configurations while the reactor was still subcritical. For all configurations the reactivity was inferred from the in-hour equation using the measured decay constant and a calculated generation time. For the configurations near critical, both the reactivity and generation time were determined using the extrapolated area-ratio method. The predicted reactivities agreed poorly with those inferred from the experiments. However, by adding 5 ppM of boron to the reflector calculational model, the calculated generation time was significantly reduced. This brought the inferred reactivity into good agreement with that calculated for all control rod configurations. This emphasizes the dependence of the interpretation of pulsed-neutron experiments on calculations and the importance of the reflector in a large HTGR. (auth)
- Research Organization:
- General Atomic, San Diego, CA
- NSA Number:
- NSA-33-022070
- OSTI ID:
- 4078459
- Journal Information:
- Nucl. Technol., v. 27, no. 3, pp. 352-375, Journal Name: Nucl. Technol., v. 27, no. 3, pp. 352-375; ISSN NUTYB
- Country of Publication:
- United States
- Language:
- English
Similar Records
A Computer Program Package for the Fort St. Vrain Pulsed Neutron Measurements
Non-Linear Subcritical Multiplication at the Fort St. Vrain HTGR
Comprehensive study of the operating and testing experience during the startup and initial operation at the Fort St. Vrain HTGR. Phase 2. Core loading, physics, and low power testing
Technical Report
·
Mon Jan 01 23:00:00 EST 1973
·
OSTI ID:4336457
Non-Linear Subcritical Multiplication at the Fort St. Vrain HTGR
Conference
·
Mon Aug 08 00:00:00 EDT 1977
·
OSTI ID:6351262
Comprehensive study of the operating and testing experience during the startup and initial operation at the Fort St. Vrain HTGR. Phase 2. Core loading, physics, and low power testing
Technical Report
·
Tue Jan 31 23:00:00 EST 1978
·
OSTI ID:5027135