PERIODIC CALIBRATION OF REACTOR PLANT FLOW INSTRUMENTATION. CORE 1, SEED 2. Test Results T-643720
Technical Report
·
OSTI ID:4073911
Periodic calibration tests were made from March 25 to April 26, 1960, on the Shippingport Pressurized Water Reactor plant flow instrumentation in order to detect and correct any calibration drift. The instrumentation tested included that for coolant loop flow, purification loop flow, and fill pump suction flow. All instrumentation, except the 1A coolant loop flow D/P cell and the fill pump suction flow D/P cell, were calibrated within plus or minus 0.5% of the instrument ranges. (D.L.C.)
- Research Organization:
- Duquesne Light Co., Shippingport, Penna.
- NSA Number:
- NSA-15-020401
- OSTI ID:
- 4073911
- Report Number(s):
- DLCS-3370101
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
PERIODIC CALIBRATION OF REACTOR PLANT FLOW INSTRUMENTATION. CORE I, SEED 3. Test Evaluation. Section 1
PERIODIC CALIBRATION OF REACTOR PLANT FLOW INSTRUMENTATION. CORE I, SEED 3. Test Evaluation
PERIODIC CALIBRATION OF LEVEL INSTRUMENTATION. CORE 1, SEED 2. Test Results T-643721
Technical Report
·
Wed Jan 31 23:00:00 EST 1962
·
OSTI ID:4805134
PERIODIC CALIBRATION OF REACTOR PLANT FLOW INSTRUMENTATION. CORE I, SEED 3. Test Evaluation
Technical Report
·
Wed Jan 31 23:00:00 EST 1962
·
OSTI ID:4815430
PERIODIC CALIBRATION OF LEVEL INSTRUMENTATION. CORE 1, SEED 2. Test Results T-643721
Technical Report
·
Fri Mar 31 23:00:00 EST 1961
·
OSTI ID:4073896