STONES. Long Range Seismic Measurements of VELA UNIFORM Project 8.4. Technical Report No. 63-126
Technical Report
·
OSTI ID:4056692
An analysis was made of the seismograms collected from the 34 mobile field teams and the observatory at the time of the STONES underground test, May 22, 1963. The results are presented as principal phases, unified magnitudes, reduced Pn and P travel times, maximum amplitudes of Pn and P, maximum amplitudes of Pg, and maximum amplitudes of Lg. (D.L.C.)
- Research Organization:
- Geotechnical Corp., Garland, Tex.
- NSA Number:
- NSA-18-016191
- OSTI ID:
- 4056692
- Report Number(s):
- NP-13586(Rev.)
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
CLEARWATER. Long Range Seismic Measurements of VELA UNIFORM Project 8.4. Technical Report No. 63-105
STONES. Long Range Seismic Measurements of VELA UNIFORM Project 8.4. Technical Report No. 63-126
MAD. Long Range Seismic Measurements of VELA UNIFORM Project 8.4
Technical Report
·
Wed Oct 16 00:00:00 EDT 1963
·
OSTI ID:4066573
STONES. Long Range Seismic Measurements of VELA UNIFORM Project 8.4. Technical Report No. 63-126
Technical Report
·
Wed May 22 00:00:00 EDT 1963
·
OSTI ID:4114082
MAD. Long Range Seismic Measurements of VELA UNIFORM Project 8.4
Technical Report
·
Tue Dec 12 23:00:00 EST 1961
·
OSTI ID:4715213