Title: Optimization of site layout for change of plant operation

Conference ·
OSTI ID:405657

Several of the Florida Power & Light operating fossil power plants have undergone significant site layout changes as well as changes in plant operation. The FPL Fort Lauderdale Plant was repowered in 1992 which consisted of using four (4) Westinghouse 501F Combustion Turbines rated at 158 Mw each, to repower two (2) existing steam turbines rates at 143 Mw each. In 1991, a physical security fence separation occurred between Turkey Point Plants`s fossil fueled Units 1&2, and its nuclear fueled Units 3&4. As a result of this separation, certain facilities common to both the nuclear side and fossil side of the plant required relocating. Also, the Sanford and Manatee Plants were evaluated for the use of a new fuel as an alternative source. Manatee Plant is currently in the licensing process for modifications to burn a new fuel, requiring expansion of backened clean-up equipment, with additional staff to operate this equipment. In order to address these plant changes, site development studies were prepared for each plant to determine the suitability of the existing ancillary facilities to support the operational changes, and to make recommendations for facility improvement if found inadequate. A standardized process was developed for all of the site studies. This proved to be a comprehensive process and approach, that gave FPL a successful result that all the various stake holders bought into. This process was objectively based, focused, and got us to where we need to be as quickly as possible. As a result, this paper details the outline and various methods developed to prepare a study following this process, that will ultimately provide the optimum site development plan for the changing plant operations.

OSTI ID:
405657
Report Number(s):
CONF-951208-; TRN: 96:004302-0021
Resource Relation:
Conference: Power-Gen America `95: power generation conference, Anaheim, CA (United States), 5-7 Dec 1995; Other Information: PBD: 1995; Related Information: Is Part Of Power-Gen `95. Book VI: Operating plants. Volume 3 - automation & information technologies. Volume 4 - plant beterment/optimization; PB: 407 p.
Country of Publication:
United States
Language:
English

Similar Records

First Westinghouse 501F combustion turbines installed in combined-cycle power plant
Journal Article · Sat May 01 00:00:00 EDT 1993 · Diesel and Gas Turbine Worldwide; (United States) · OSTI ID:405657

501F design and update and FPL Lauderdale operating experience
Conference · Sun Dec 31 00:00:00 EST 1995 · OSTI ID:405657

Two years of 501F operation at Florida power & light
Journal Article · Fri Sep 01 00:00:00 EDT 1995 · Turbomachinery International · OSTI ID:405657