Operating experience and lessons learned at Alabama Electric Cooperative`s 110-MW 26-hour CAES plant

Conference ·
OSTI ID:405624

Energy storage options for utilities technologies using hydrostatic-head-, compressed air-, battery-, superconducting-magnet-, and flywheel-based power generation. Among these technologies, compressed-air energy storage (CAES) offers specific cost advantage in its range of capacity and stored energy. Partly because of this cost advantage, Alabama Electric Cooperative (AEC), with assistance from the Electric Power Research Institute (EPRI), now operates the first CAES power plant in the United States. This 110-MW, 26-hour CAES plant is located on top of the McIntosh salt dome, approximately 40 miles north of Mobile, Alabama. Energy Storage and Power Consultants, Inc. (ESPC) is Technical Engineering Support Contractor to EPRI on the project. This paper addresses operating statistics, narrates problems that influenced power generation, and provides selected lessons learned. Unit availability and reliability are noted and major events that affected them identified.

OSTI ID:
405624
Report Number(s):
CONF-951208--
Country of Publication:
United States
Language:
English

Similar Records

History of first US compressed air energy storage (CAES) plant (110-MW-26 h)
Technical Report · Mon Nov 30 23:00:00 EST 1992 · OSTI ID:6843143

AEC 110 mw CAES plant; Status of project
Conference · Mon Dec 31 23:00:00 EST 1990 · Proceedings of the American Power Conference; (United States) · OSTI ID:6174173

History of first US compressed air energy storage (CAES) plant (110-MW-26 h). Volume 1, Early CAES development: Final report
Technical Report · Mon Nov 30 23:00:00 EST 1992 · OSTI ID:10120190