DESIGN MODIFICATIONS TO THE SRE DURING FY 1960
The means used to prevent the recurrence of tetralin leakage into the SRE sodium systems are discussed. Included is a description of the redssign of system components to utilize alteraate coolants such as nitrogen, air, and NaK. The use of kerosene to replace tetralin, where double containment is provided, is discussed. The physical properties are compared, and kerosene is shown to be free of the undesirable characteristics of tetralin. The fuelelement cleaning systsm was redesigned for steam washing, followed by a water rinse and vacuum drying. Hydrogen gas evolved during washing is oxidized with copper oxide to eliminate the possibility of a hydrogen-oxygen explosion if air should accidentally enter the vent system. The fuel element was changed from a seven- to a five-rod cluster to provide additional clearance in the channel. Element hardware was modified to provide an orifice location which will permit more precise flow calculations; a redesigned hanger assembly which will minimize sodium holdup; and filter screene at the channel entrance to prevent in-cluster plugging. Diagnostic instrumentation was provided for the reactor to monitor: fission-product activity in the reactor cover gas; rapidly varying reactor parameters during a reactor scram; internnl and aheath fuel temperatures; and fuinctions being performed whioh wiIl indicate the mode of operation. The data wiIl provide additionul information to the reactor operator, as well as provide a more comprehereive coverage for reaotor analysis. (auth)
- Research Organization:
- Atomics International. Div. of North American Aviation, Inc., Canoga Park, Calif.
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AT(11-1)-GEN-8
- NSA Number:
- NSA-15-013984
- OSTI ID:
- 4054677
- Report Number(s):
- NAA-SR-5348(Rev.)
- Country of Publication:
- United States
- Language:
- English
Similar Records
ANALYSIS OF SRE POWER EXCURSION OF JULY 13, 1959
NaK FREE CONVECTION COOLED SHAFT FREEZE SEAL FOR SRE PUMPS
SRE STANDARD OPERATING PROCEDURES
Technical Report
·
Fri Sep 15 00:00:00 EDT 1961
·
OSTI ID:4834977
NaK FREE CONVECTION COOLED SHAFT FREEZE SEAL FOR SRE PUMPS
Technical Report
·
Thu Jun 18 00:00:00 EDT 1959
·
OSTI ID:4142490
SRE STANDARD OPERATING PROCEDURES
Technical Report
·
Mon Jun 27 00:00:00 EDT 1960
·
OSTI ID:4105151