Rehabilitation of a 410-MW utility boiler at Costa Sur, Puerto Rico

Conference ·
OSTI ID:405457
To increase unit reliability and availability and to meet the current and future electric power demands in Puerto Rico, the Puerto Rico Electric Power Authority (PREPA) recently performed a scheduled outage rehabilitation of Costa Sur Power Station Unit 5. This major rehabilitation of a 23-year-old, 410 MW, oil-fired boiler was accompanied by the upgrading of the low-pressure turbine with new rotors. The boiler rehabilitation included the replacement of all waterwall floor panels from just below the burner windbox, down to the lower drum. Temporary support was provided for the lower drum and its structural system during the panel replacement. The steam drum internals were completely rehabilitated, with the installation of a new liner and cleaning and repair of other internals as required. The superheater and reheater desuperheater liners were also replaced. In addition, all major components of both the firing system and the air preheaters were replaced. The gas recirculation fan was rehabilitated, and its discharge duct was replaced.
OSTI ID:
405457
Report Number(s):
CONF-951208--
Country of Publication:
United States
Language:
English