Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Application of EPRI risk-based inservice inspection procedure to combustion engineering design of nuclear power plant

Conference ·
OSTI ID:404248
 [1];  [2]
  1. ABB Combustion Engineering, Windsor, CT (United States). Nuclear Operations
  2. Entergy Operations-ANO2, Russellville, AR (United States)

The EPRI developed risk-based inservice inspection procedure is used to select the elements for inservice inspection on a section of the high pressure safety injection system of the Entergy Operations ANO2 nuclear plant. This plant is the pilot plant in a six utility-eleven plant EPRI tailored collaboration program to apply the general EPRI procedures to Combustion Engineering NSSS designs. The procedure results in a reduction of candidate inspection locations from 14, based on current ASME Section XI rules for B-J welds to 3, based on the risk-based selection criteria.

OSTI ID:
404248
Report Number(s):
CONF-960706--; ISBN 0-7918-1786-5
Country of Publication:
United States
Language:
English