Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Two phase pipeline design and practice in JZ20-2 offshore gas field development

Conference ·
OSTI ID:402981
 [1]
  1. China Offshore Oil Development and Engineering Co., Beijing (China)
The first two phase flow submarine pipeline in China sea of 12 in. and 51 km long was designed, installed and operated in early summer 1993 after careful study. The practice shows that the slug catcher is one of the key factors in two phase flow pipeline design. It gives a lot of enlightenments and inspirations, the main points are: defining liquid hold up attentively; meticulously design configuration, downstream separator necessity, reasonable design allowance of handling capacity, operation experience and pigging period, varied slug catcher forms.
OSTI ID:
402981
Report Number(s):
CONF-940473--; ISBN 1-880653-15-X
Country of Publication:
United States
Language:
English

Similar Records

Sizing wet-gas pipelines and slug catchers with steady-state multiphase flow simulations
Conference · Wed Dec 30 23:00:00 EST 1998 · OSTI ID:357815

By-pass pig passes test for two-phase pipelines
Journal Article · Mon Oct 14 00:00:00 EDT 1996 · Oil and Gas Journal · OSTI ID:382937

By-pass pigs for two-phase flow pipelines
Conference · Mon Dec 30 23:00:00 EST 1996 · OSTI ID:418207