PRESSURIZED WATER REACTOR (PWR) PROJECT. Technical Progress Report for the Period December 24, 1960-February 23, 1961
Technical Report
·
OSTI ID:4027406
PWR Core 2. Borated stainless steel was adopted as the burnable poison material, and the size of the poison wafers and boron loading was established. Acceptable blanket oxide plates were fabricated consistentiy by the isostaticpressure-bonding technique. A satisfactory method was developed for inspection of fuel elements for bond quality. Fuel assembly sampling rakes were redesigned to permit installing outlet temperature thermocouples in preassembled shrouds and closure head. Metallurgy of Core Materials. In-pile thermal conductivities were measured for UO/sub 2/, ZrC/sub 2/-34 wt.% UC/sub 2/, and ZrO/ sub 2/--46 wt.% UC/sub 2/, and irradiation growths in fuel plates containing these materials were determined. Two pressurebonded 1 wt.% B/sup 10/ -austenitic stainless steel poison plates after a 60% burnup of the B/sup 10/ atoms showed 3 to 4% thickness increase. Borated stainless steel poison cores coated with chromium plus sprayed graphite contained a void space at the compartment ends equivalent to 0.6% of the total core length, while similar cores coated with chromium alone exhibited no void space. Reactor Physics. As test of a cluster mockup of Core 2 was run in the KAPL PTR facility in which measurements of reactivity, power distributions, peaking factors, and boron capture fractions at 535 deg F were made. The last eight of ten UC/sub 2/ fuel elements removed from the PWR-1 blanket during the Seed 2 refueling were analyzed for U and Pu isotopic content. PWR Core 1. The length of a depleted Seed 1 cluster was measured. The special oxide assembly was modified in order to be comparable to the latest Core 2 design. The applicability of modified Seed 2 physics data to Seed 3 operation was verified, and the effect on core power of operation with two depleted Seed 2 clusters in blanket locations during Seed 3 lifetime was evaluated. Power Plant Support. The PWR-1 Seed 2 life will be extended by operating the plant at reduced average temperature and power. A preferred solution composition was established for dissolving core meltdown products. (D.L.C.)
- Research Organization:
- Westinghouse Electric Corp. Bettis Atomic Power Lab., Pittsburgh
- DOE Contract Number:
- AT(11-1)-GEN-14
- NSA Number:
- NSA-15-016735
- OSTI ID:
- 4027406
- Report Number(s):
- WAPD-MRP-90
- Country of Publication:
- United States
- Language:
- English
Similar Records
PRESSURIZED WATER REACTOR (PWR) PROJECT TECHNICAL PROGRESS REPORT FOR THE PERIOD FEBRUARY 24, 1961 TO APRIL 23, 1961
PRESSURIZED WATER REACTOR (PWR) PROJECT TECHNICAL PROGRESS REPORT FOR THE PERIOD AUGUST 24, 1962 TO OCTOBER 23, 1962
PRESSURIZED WATER REACTOR (PWR) PROJECT. Technical Progress Report for the Period August 24 to October 23, 1960
Technical Report
·
Mon Oct 30 23:00:00 EST 1961
·
OSTI ID:4046740
PRESSURIZED WATER REACTOR (PWR) PROJECT TECHNICAL PROGRESS REPORT FOR THE PERIOD AUGUST 24, 1962 TO OCTOBER 23, 1962
Technical Report
·
Wed Oct 30 23:00:00 EST 1963
·
OSTI ID:4729166
PRESSURIZED WATER REACTOR (PWR) PROJECT. Technical Progress Report for the Period August 24 to October 23, 1960
Technical Report
·
Mon Oct 30 23:00:00 EST 1961
·
OSTI ID:4027468