Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Phase I remedial design report and remedial action work plan for the lower East Fork Popular Creek Operable Unit, Oak Ridge, Tennessee

Technical Report ·
OSTI ID:402373

The Phase I Remedial Design Report and Remedial Action Work Plan for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee, has been prepared in response to direction from the US Department of Energy under Contract No. DE-AC05-84OR21400. This Phase I action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing portions of the contaminated floodplain soil at the National Oceanic and Atmospheric Administration site (NOAA) site located along EFPC. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant Facility Agreement (1992) by requiring excavation of soils with 400 parts per million (ppm) mercury contaminants.

Research Organization:
Oak Ridge National Lab., TN (United States); Science Applications International Corp., Oak Ridge, TN (United States); Foster-Wheeler Environmental Corp., Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-96OR22464
OSTI ID:
402373
Report Number(s):
DOE/OR--01-1448-D2; ON: TI97001108
Country of Publication:
United States
Language:
English