POTASSIUM CORROSION TEST LOOP DEVELOPMENT. Quarterly Progress Report No. 2, October 15, 1963-January 15, 1964
Technical Report
·
OSTI ID:4010248
The design and development of corrosion test loops for studying refractory alloys in boiling and condensing sodium and potassium are summarized. The design and fabrication of Component Evaluation Test Loop II, the single-phase forced-circulation sodium loop, operated at 2100 deg F are completed. The design of the Pre-prototype Corrosion Test Loop, a two loop system is being continued. Test Loop I, the natural convection sodium loop, is being helium leak tested and baked out at 250 deg F. The helium purification system and helium analysis system are described and evaluated. (N.W.R.)
- Research Organization:
- General Electric Co. Spacecraft Dept., Cincinnati
- DOE Contract Number:
- NAS3-2547
- NSA Number:
- NSA-18-020473
- OSTI ID:
- 4010248
- Report Number(s):
- NASA-CR-54008
- Resource Relation:
- Other Information: Orig. Receipt Date: 31-DEC-64
- Country of Publication:
- United States
- Language:
- English
Similar Records
POTASSIUM CORROSION TEST LOOP DEVELOPMENT. Quarterly Progress Report 1, July 15, 1963 through October 15, 1963
METALLURGY DIVISION QUARTERLY PROGRESS REPORT FOR PERIOD ENDING OCTOBER 31, 1951
RESEARCH ON PHYSICAL AND CHEMICAL PRINCIPLES AFFECTING HIGH TEMPERATURE MATERIALS FOR ROCKET NOZZLES. Quarterly Progress Report, April 1, 1963-June 30, 1963
Technical Report
·
Sat Oct 31 00:00:00 EST 1964
·
OSTI ID:4010248
METALLURGY DIVISION QUARTERLY PROGRESS REPORT FOR PERIOD ENDING OCTOBER 31, 1951
Technical Report
·
Mon Apr 21 00:00:00 EST 1952
·
OSTI ID:4010248
RESEARCH ON PHYSICAL AND CHEMICAL PRINCIPLES AFFECTING HIGH TEMPERATURE MATERIALS FOR ROCKET NOZZLES. Quarterly Progress Report, April 1, 1963-June 30, 1963
Technical Report
·
Thu Oct 31 00:00:00 EST 1963
·
OSTI ID:4010248