Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Close-in blasting at the TRI-MET light rail tunnels in Portland, Oregon

Conference ·
OSTI ID:400798
Frontier/Traylor Joint Venture is presently constructing a section of the Tri-County Metropolitan Transit District of Oregon`s (TRI-MET) Westside Light Rail System. This new section will extend Portland`s existing transit system to the western suburbs of Beaverton and Hillsboro. The drill-blast excavations at this project include 10,000 feet of 20 foot tunnel, 18 cross passages, three shafts, an underground railway station, and a U-wall open cut. From a blast designer`s perspective, this job has been extremely challenging. Blast vibration is limited to 0.5 ips at 200 feet or at the nearest structure, and airblast is limited to 129 dB--linear peak and 96 dB--C scale. The tunnels pass under heavily built up areas and have top of tunnel to surface cover distances as low as 70 feet. Surface blasting in the 26,000 cubic yard U-wall excavation was limited to five short nighttime periods due to its proximity to the very busy highway 26. This paper describes the techniques that were used to develop safe blasting designs for the TRI-MET Surface blasts and tunnel rounds. It also discusses the measures that were necessary to mitigate noise, vibration, and flyrock.
OSTI ID:
400798
Report Number(s):
CONF-950247--
Country of Publication:
United States
Language:
English

Similar Records

Environmental effects of blasting and their control
Conference · Thu May 01 00:00:00 EDT 1997 · OSTI ID:469028

Enlarging the underground hydroelectric plant at Villarino, Spain
Conference · Thu May 01 00:00:00 EDT 1997 · OSTI ID:469026

Blasthole timing control vibration, airblast and flyrock
Journal Article · Thu Dec 31 23:00:00 EST 1987 · Coal Min. Process.; (United States) · OSTI ID:5041660