Title: Tanks focus area multiyear program plan FY97-FY99

Abstract

The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. The focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE`s national tank system. The TFA is responsible for technology development to support DOE`s four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure.

Publication Date:
Research Org.:
Pacific Northwest National Lab., Richland, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
395444
Report Number(s):
PNNL-11272
ON: DE96050373; TRN: 97:000013
DOE Contract Number:  
AC06-76RL01830
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Aug 1996
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; HIGH-LEVEL RADIOACTIVE WASTES; UNDERGROUND STORAGE; RADIOACTIVE WASTE PROCESSING; ALPHA-BEARING WASTES; LEAKS; SAFETY; TANKS; BUDGETS; RECOMMENDATIONS

Citation Formats

. Tanks focus area multiyear program plan FY97-FY99. United States: N. p., 1996. Web. doi:10.2172/395444.
. Tanks focus area multiyear program plan FY97-FY99. United States. doi:10.2172/395444.
. Thu . "Tanks focus area multiyear program plan FY97-FY99". United States. doi:10.2172/395444. https://www.osti.gov/servlets/purl/395444.
@article{osti_395444,
title = {Tanks focus area multiyear program plan FY97-FY99},
author = {},
abstractNote = {The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. The focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE`s national tank system. The TFA is responsible for technology development to support DOE`s four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure.},
doi = {10.2172/395444},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1996},
month = {8}
}