Pipeline project requires varying construction techniques
Journal Article
·
· Pipeline and Gas Journal
OSTI ID:392258
This paper reviews the construction and directional drilling design associated with a oil and gas pipelines project in the Scott Bay area of Houston, Texas. The project included pulling over 5,000 feet of 16-inch pipeline through the drilled bay crossing. The paper discusses the pipeline route, the drilling equipment used, the tie-in methods, and methods for replacing 8 miles of land laid pipelines.
- OSTI ID:
- 392258
- Journal Information:
- Pipeline and Gas Journal, Journal Name: Pipeline and Gas Journal Journal Issue: 6 Vol. 223; ISSN PLGJAT; ISSN 0032-0188
- Country of Publication:
- United States
- Language:
- English
Similar Records
Pipeline abrasion coatings survive extended bottom tow
CFPL installs products pipeline with directional drilling
Directional boring produces a better pipeline crossing
Journal Article
·
Sun Mar 01 23:00:00 EST 1987
· Oil Gas J.; (United States)
·
OSTI ID:6668301
CFPL installs products pipeline with directional drilling
Journal Article
·
Sun Dec 31 23:00:00 EST 1995
· Pipeline and Gas Journal
·
OSTI ID:242236
Directional boring produces a better pipeline crossing
Journal Article
·
Sat Jun 01 00:00:00 EDT 1996
· Pipeline and Gas Journal
·
OSTI ID:392261