Portable power source needs of the future Army -- Batteries and fuel cells
Conference
·
OSTI ID:382668
- Communications-Electronics Command, Fort Belvoir, VA (United States)
- Communications-Electronics Command, Fort Monmouth, NJ (United States)
- Army Research Office, Research Triangle Park, NC (United States)
- Army Research Lab., Fort Monmouth, NJ (United States)
This paper describes the US Army`s future needs for silent portable power in the area of batteries and fuel cells. These needs will continue to increase as a result of the introduction of newer types of equipment, the increasing digitization of the battlefield, and future integrated Soldier Systems. Current battery programs are aimed at improved, low-cost primary batteries, and rechargeable batteries with increased energy densities. The Army fuel cell program aimed at portable systems capable of the order of 150W is also described.
- OSTI ID:
- 382668
- Report Number(s):
- CONF-960112--; ISBN 0-7803-2994-5
- Country of Publication:
- United States
- Language:
- English
Similar Records
US Army battery needs -- Present and future
U.S. Army PEM fuel cell programs
Mobile electric power technologies for the Army of the future: engines, power source, and electrical aspects
Conference
·
Sat Jul 01 00:00:00 EDT 1995
·
OSTI ID:69713
U.S. Army PEM fuel cell programs
Conference
·
Tue Dec 30 23:00:00 EST 1997
·
OSTI ID:349013
Mobile electric power technologies for the Army of the future: engines, power source, and electrical aspects
Technical Report
·
Thu Dec 31 23:00:00 EST 1987
·
OSTI ID:5779826