Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Effect of opening of joints on the behavior of concrete dams during operation

Journal Article · · Hydrotechnical Construction
DOI:https://doi.org/10.1007/BF01544999· OSTI ID:379319
The present work presents the results of studies of the effect of thermal opening of joints on the downstream face on opening of the contact joint and was carried out for the example of the dam of the Bratsk hydroelectric station. Theoretical investigations confirmed considerable opening of the contact joint both in nonoverflow and in powerhouse sections. Other conditions being equal, the length of the zone of opening of the contact joint in the powerhouse sections is 2-3 meters greater than in the nonoverflow sections. In the winter period, the zone of opening in the powerhosue sections reaches the grout curtain, while in the summer period, the opening is about half as much. Such opening of the joint, together with decompressions of the foundation, leads to an increase in the uplift pressure, increase of seepage discharges, and decrease of safety against shearing. Calculations showed that the zone of opening of the contact joint can be followed by a closed joint zone with displaced surfaces (sliding zone). The size of the zone depends on many factors and requires further refinements, but in any event, this zone can completely enter the second column.
Sponsoring Organization:
USDOE
OSTI ID:
379319
Journal Information:
Hydrotechnical Construction, Journal Name: Hydrotechnical Construction Journal Issue: 2 Vol. 29; ISSN 0018-8220; ISSN HYCOAR
Country of Publication:
United States
Language:
English

Similar Records

On-site investigations of the effect of external forces on the contact zone of the Bratsk dam
Journal Article · Tue Sep 01 00:00:00 EDT 1987 · Hydrotech. Constr.; (United States) · OSTI ID:5293517

Concrete dam on the Bratsk hydroelectric station
Journal Article · Fri Jul 01 00:00:00 EDT 1988 · Hydrotech. Constr.; (United States) · OSTI ID:6171522

Concrete dam of the Lenin Dnepr hydroelectric station
Journal Article · Wed Dec 31 23:00:00 EST 1986 · Hydrotech. Constr.; (United States) · OSTI ID:5767131