Performance of the TLS at SRRC
Conference
·
OSTI ID:378749
- and others
3-year operation experiences of the 1.3 GeV synchrotron radiation facility at SRRC are presented. Two insertion devices (W20 and U10p) are installed in the storage ring; more are under construction. Single bunch instabilities were measured and ring impedance calculated. Both transverse and longitudinal coupled bunch instabilities were observed and corresponding feedback system constructed. The transverse feedback system is now routinely operated. A fast global orbit feedback system is in the development stage. Lifetime is about 5 hours at 200 mA; plans to increase lifetime are proposed. At present, the machine can be operated at nominal design energy 1.3 GeV with full energy injection and ramped up to 1.5 GeV at 200 mA.
- Research Organization:
- Brookhaven National Lab., Upton, NY (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 378749
- Report Number(s):
- BNL--63252; CONF-960621--30; ON: DE96014550
- Country of Publication:
- United States
- Language:
- English
Similar Records
Damping rates of the SRRC storage ring
Beam lifetime investigations at SRRC
Performance of the transverse coupled-bunch feedback system in the SRRC
Conference
·
Thu Jun 01 00:00:00 EDT 1995
·
OSTI ID:72993
Beam lifetime investigations at SRRC
Conference
·
Tue Oct 01 00:00:00 EDT 1996
·
OSTI ID:378744
Performance of the transverse coupled-bunch feedback system in the SRRC
Conference
·
Tue Oct 01 00:00:00 EDT 1996
·
OSTI ID:378679