Acceptance testing for battery-electric bus procurements: Planning, inspection, and testing guidelines. Final report
This Acceptance Test Plan (ATP) is intended to guide the inspection and testing of the bus(es) fabricated by Contractor for Buyer in accordance with the contract(s) dated MM, DD, YYYY, and the subsequent change orders and contract modifications. The inspection worksheets and report forms presented in the Appendix are intended to assist in documentation of the inspection process and its findings. Alternatively, existing Contractor worksheets and reports may be used if it can be demonstrated that all relevant technical criteria are encompassed therein. This ATP is intended solely as a guide for the inspection and testing of the bus(es), their associated service, operating, training, and maintenance manuals, mechanical and electrical schematics, software and interfaces, and the special tools delivered in accordance with the technical specifications of the contract(s) cited above. Determination of the Contractor`s compliance with contractual provisions other than those of the technical specifications is beyond the scope of this ATP. Furthermore, this ATP is not intended to determine compliance of Contractor`s Bid Package with requirements of the bid solicitation, nor is it intended to be used in activities associated with the Design Review specified in the contractual documents.
- Research Organization:
- Electric Power Research Inst., Palo Alto, CA (United States); Santa Barbara Electric Transportation Inst., CA (United States)
- Sponsoring Organization:
- Electric Power Research Inst., Palo Alto, CA (United States)
- OSTI ID:
- 362628
- Report Number(s):
- EPRI-TR--110615
- Country of Publication:
- United States
- Language:
- English
Similar Records
Diesel generator acceptance test report
Acceptance inspection plan 105KE Facility modifications for fuel retrieval subproject