PUREX new substation ATR
This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience.
- Research Organization:
- Fluor Daniel Hanford Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 362456
- Report Number(s):
- HNF-SD-CP-ATR--089; ON: DE99051015; BR: EW7003000
- Country of Publication:
- United States
- Language:
- English
Similar Records
HEMP Testing of Substation Yard Circuit Breaker Control and Protective Relay Circuits
Design requirements document for the phase 1 privatization electrical power system
Conceptual Design Report, Exploratory Shaft Power Line and Substation, Project B-417
Technical Report
·
Tue Sep 01 00:00:00 EDT 2020
·
OSTI ID:1669208
Design requirements document for the phase 1 privatization electrical power system
Technical Report
·
Thu Oct 30 23:00:00 EST 1997
·
OSTI ID:362567
Conceptual Design Report, Exploratory Shaft Power Line and Substation, Project B-417
Technical Report
·
Sun Feb 28 23:00:00 EST 1982
·
OSTI ID:5421608