Design of the 200 MWe (net) Tonghae Thermal Power Plant circulating fluidized bed steam generator
Conference
·
OSTI ID:355816
- ABB Combustion Engineering Inc. (United States)
Combustion Engineering, Inc. (ABB-CE) has been awarded the contract to design a 200 MWe (net) CFB firing a Korean Anthracite fuel as a part of a plant located in Tonghae, Republic of Korea and owned and operated by Korea Electric Power Company (KEPCO). As part of the plant, this ABB-CE FLEXTECH{trademark} fluidized bed boiler will be required to fire a range of seven different fuels, achieve a boiler turndown to 30% load, and meet the customer`s steam and reheat steam temperature control and start-up time requirements. This paper discusses the above design considerations, heat duty distributions throughout the unit, and the boiler island auxiliary equipment system design.
- OSTI ID:
- 355816
- Report Number(s):
- CONF-9705116--; ISBN 0-7918-1557-9
- Country of Publication:
- United States
- Language:
- English
Similar Records
FlexTech{trademark}
Six years of ABB-CE, petcoke and fluid beds
Design of a 165 MWe reheat coal-fired circulating fluidized bed boiler for Nova Scotia Power Corporation
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:459093
Six years of ABB-CE, petcoke and fluid beds
Conference
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:29028
Design of a 165 MWe reheat coal-fired circulating fluidized bed boiler for Nova Scotia Power Corporation
Conference
·
Sun Dec 31 23:00:00 EST 1989
·
OSTI ID:5794123