Outage risk assessment and management implementation at Fermi 2. Final report
Technical Report
·
OSTI ID:354906
- ERIN Engineering and Research, Inc., Campbell, CA (United States)
The Detroit Edison Company (DECo), in cooperation with EPRI, installed the Outage Risk Assessment and Management (ORAM{trademark}) software at Enrico Fermi Plant 2 and used it during the plant`s fifth refueling outage (RF05). EPRI developed ORAM to help plant personnel ensure that system configurations provide an adequate level of safety during scheduled testing and component maintenance. When ORAM models are properly developed and configures for specific plants (as they were at Fermi 2), they can be used during outages to evaluate changes or potential changes to the outage schedule. During the Fermi 2 refueling outage, ORAM provided DECo personnel a continuous overview of plant safety and displayed cautions about plant configurations posing higher levels of risk. Throughout, plant personnel were able to observe variations in shutdown risk. Outage planners and managers gained insight into those factors having the strongest influence on safety and into effective contingency planning actions that will be useful in future outages. Experience gained from Fermi 2`s implementation of ORAM will be beneficial to all utilities.
- Research Organization:
- Electric Power Research Inst., Palo Alto, CA (United States); ERIN Engineering and Research, Inc., Campbell, CA (United States)
- Sponsoring Organization:
- Electric Power Research Inst., Palo Alto, CA (United States)
- OSTI ID:
- 354906
- Report Number(s):
- EPRI-TR--109013
- Country of Publication:
- United States
- Language:
- English
Similar Records
Outage risk management
ORAM-SENTINEL{trademark} development and ORAM integration at Catawba and McGuire. Final report
ORAM-SENTINEL{trademark} demonstration at Fitzpatrick. Final report
Journal Article
·
· EPRI Journal (Electric Power Research Institute); (United States)
·
OSTI ID:5140857
ORAM-SENTINEL{trademark} development and ORAM integration at Catawba and McGuire. Final report
Technical Report
·
Mon Jun 01 00:00:00 EDT 1998
·
OSTI ID:10140630
ORAM-SENTINEL{trademark} demonstration at Fitzpatrick. Final report
Technical Report
·
Mon Jun 01 00:00:00 EDT 1998
·
OSTI ID:354974