Project specific quality assurance plan for Project W-178, 219-S secondary containment

Technical Report ·
DOI:https://doi.org/10.2172/35408· OSTI ID:35408

The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
35408
Report Number(s):
WHC-SD-W178-QAPP--001; ON: DE95008855
Country of Publication:
United States
Language:
English

Similar Records

Project management plan for Project W-178, 219-S secondary containment
Technical Report · Wed Jan 25 23:00:00 EST 1995 · OSTI ID:10118790

Conceptual design report, 219-S secondary containment upgrade, Project W-178
Technical Report · Sat May 01 00:00:00 EDT 1993 · OSTI ID:10169778

Project quality assurance plant: Sodium storage facility, project F-031
Technical Report · Mon Oct 31 23:00:00 EST 1994 · OSTI ID:10115846