Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Evaluation of the 296-C-006 HVAC system for tank 241-C-106

Technical Report ·
DOI:https://doi.org/10.2172/350900· OSTI ID:350900
Prior to the sluicing of Tank 241-C-106, the 296-P-16 ventilation system will be shutdown and the 296-C-006 ventilation system operation will be initiated. The 296-C-006 system has a low once through flow with an additional recirculation flow in the tank dome space. A minimum dome pressure of -3 in W.G. is necessary for safe operation. An evaluation of the system has been performed. The results of the study show that adequate dome space vacuum can be achieved if the pump pits in Tank 241-C-106 are sealed.
Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
350900
Report Number(s):
HNF--2935; ON: DE99050752; BR: EW3130010
Country of Publication:
United States
Language:
English

Similar Records

Tank vapor sampling and analysis data package for tank 241-C-106 waste retrieval sluicing system process test phase III
Technical Report · Fri Aug 13 00:00:00 EDT 1999 · OSTI ID:797713

C-106 tank process ventilation test
Technical Report · Mon Jul 20 00:00:00 EDT 1998 · OSTI ID:10148560

Tank 241-C-106 in-tank imaging system operational test report
Technical Report · Tue Jul 07 00:00:00 EDT 1998 · OSTI ID:10148355