Coal slurry pipelines: Blach Mesa and future projects
Conference
·
OSTI ID:349125
- Williams Technologies Inc. (United States)
Most people in the mining industry have some familiarity with pipelining of minerals in slurry form, however, many may not realize the extent that mineral slurry pipeline transport is used throughout the world. The author is referring to the shipment of the minerals in the raw or concentrate form, not tailings pipelines which are also commonplace in the minerals industry. There are over forty mineral pipelines around the world. The list covers a wide range of minerals, including copper ore concentrate, iron ore concentrate, limestone, phosphate concentrate, kaolin, Gilsonite and gold ore, with only eleven of the mineral pipelines located in the USA. It should be noted that one of the earliest slurry pipelines was a 108 mile coal slurry pipeline in Ohio, which started up in 1957. The pipeline only operated until 1963 when a railroad company literally bought out the transportation contract. This really was the beginning of the unit train concept. Each mineral has specific physical and chemical characteristics to be considered when evaluating transport by pipeline. The processing required at the pipeline origin, as well as at the pipeline termination, are also important factors in determining slurry pipeline feasibility. Transport distance, annual volume, and continuity of shipments are other important factors. One of the most difficult minerals to transport as a slurry is coal because the specific gravity is closer to water than most other minerals. Thus, the fine balance of creating enough fine particles to serve as a carrier for the coarser material, while at the same time having a material that can be economically dewatered is very sensitive and technical designs will vary with types of coal. Additionally, since coal is purchased for its thermal value, excess surface moisture can lower the value of the coal to the customer. One of the most successful slurry pipeline operations, and the only current operating long-distance coal slurry pipeline is the Black Mesa Pipeline System. The Black Mesa Pipeline is a 273 mile (439 km) long, 18-inch (457 mm) coal/water slurry pipeline, originating on the Black Mesa in the Northeastern part of Arizona, USA. The system delivers coal from the Peabody Coal Company`s Black Mesa open pit mine to the Mohave Generating Station which is a 1580 MW steam powered electric generating plant located in Laughlin, Nevada. Black Mesa Pipeline began commercial operation in November, 1970 and has transported in excess of 110,000,000 tons (99,800,000 metric tons) of coal with an availability factor of 99%.
- OSTI ID:
- 349125
- Report Number(s):
- CONF-980985--; ISBN 1-890977-15-2
- Country of Publication:
- United States
- Language:
- English
Similar Records
The Black Mesa coal/water slurry pipeline system
Mining coal on Black Mesa
Modular plant recovers high quality fuel from slurry pond
Conference
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:41556
Mining coal on Black Mesa
Conference
·
Wed Dec 31 23:00:00 EST 1980
· Instrum. Min. Metall. Ind.; (United States)
·
OSTI ID:5730798
Modular plant recovers high quality fuel from slurry pond
Conference
·
Thu Jul 01 00:00:00 EDT 1999
·
OSTI ID:20013419