PUREX exhaust ventilation system installation test report
This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 345059
- Report Number(s):
- HNF-SD-CP-ATR--087; ON: DE99050289; BR: EW7050000
- Country of Publication:
- United States
- Language:
- English
Similar Records
PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report
Acceptance test procedure for SY Tank Farm replacement exhauster unit
Heating/cooling/ventilation unit
Technical Report
·
Tue Oct 07 00:00:00 EDT 1997
·
OSTI ID:344976
Acceptance test procedure for SY Tank Farm replacement exhauster unit
Technical Report
·
Thu Dec 15 23:00:00 EST 1994
·
OSTI ID:10118282
Heating/cooling/ventilation unit
Patent
·
Tue Jul 07 00:00:00 EDT 1987
·
OSTI ID:6257910