Title: Technical evaluation report TMI action -- NUREG-0737 (II.D.1). Relief and safety valve testing, Watts Bar Nuclear Plant, Units 1 and 2 (Dockets 50-390 and 50-391)

Abstract

In the past, safety and relief valves installed in the primary coolant system of light water reactors have performed improperly. As a result, the authors of NUREG-0578 (TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations) and, subsequently, NUREG-0737 (Clarification of TMI Action Plan Requirements) recommended development and completion of programs to do two things. First, they should reevaluate the functional performance capabilities of pressurized water reactor safety, relief, and block valves. Second, they should verify the integrity of the pressurizer safety and relief valve piping systems for normal, transient, and accident conditions. This report documents the review of those programs by Lockheed Idaho Technologies Company. Specifically, this report documents the review of the Watts Bar Nuclear Plant, Units 1 and 2, Applicant response to the requirements of NUREG-0578 and NUREG-0737. This review found the Applicant provided an acceptable response reconfirming they met General Design Criteria 14, 15, and 30 of Appendix A to 10 CFR 50 for the subject equipment. It should also be noted Lockheed Idaho performed this review for both Units 1 and 2. However, the applicability of this review to Unit 2 depends on verifying that the Unit 2 as-built system conforms to the Unitmore » 1 design reviewed in this report.« less

Authors:
Publication Date:
Research Org.:
Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States); Nuclear Regulatory Commission, Washington, DC (United States)
OSTI Identifier:
34323
Report Number(s):
INEL-94/0277
ON: DE95008662; TRN: 95:009624
DOE Contract Number:
AC07-94ID13223
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Feb 1995
Country of Publication:
United States
Language:
English
Subject:
21 NUCLEAR POWER REACTORS AND ASSOCIATED PLANTS; WATTS BAR-1 REACTOR; PRIMARY COOLANT CIRCUITS; VALVES; PIPES; WATTS BAR-2 REACTOR; PERFORMANCE TESTING; PRESSURIZATION; SPECIFICATIONS; MEASURING METHODS; SUPPORTS; THERMAL ANALYSIS; STRESS ANALYSIS; ELECTRIC CONTROLLERS

Citation Formats

Fineman, C.P.. Technical evaluation report TMI action -- NUREG-0737 (II.D.1). Relief and safety valve testing, Watts Bar Nuclear Plant, Units 1 and 2 (Dockets 50-390 and 50-391). United States: N. p., 1995. Web. doi:10.2172/34323.
Fineman, C.P.. Technical evaluation report TMI action -- NUREG-0737 (II.D.1). Relief and safety valve testing, Watts Bar Nuclear Plant, Units 1 and 2 (Dockets 50-390 and 50-391). United States. doi:10.2172/34323.
Fineman, C.P.. Wed . "Technical evaluation report TMI action -- NUREG-0737 (II.D.1). Relief and safety valve testing, Watts Bar Nuclear Plant, Units 1 and 2 (Dockets 50-390 and 50-391)". United States. doi:10.2172/34323. https://www.osti.gov/servlets/purl/34323.
@article{osti_34323,
title = {Technical evaluation report TMI action -- NUREG-0737 (II.D.1). Relief and safety valve testing, Watts Bar Nuclear Plant, Units 1 and 2 (Dockets 50-390 and 50-391)},
author = {Fineman, C.P.},
abstractNote = {In the past, safety and relief valves installed in the primary coolant system of light water reactors have performed improperly. As a result, the authors of NUREG-0578 (TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations) and, subsequently, NUREG-0737 (Clarification of TMI Action Plan Requirements) recommended development and completion of programs to do two things. First, they should reevaluate the functional performance capabilities of pressurized water reactor safety, relief, and block valves. Second, they should verify the integrity of the pressurizer safety and relief valve piping systems for normal, transient, and accident conditions. This report documents the review of those programs by Lockheed Idaho Technologies Company. Specifically, this report documents the review of the Watts Bar Nuclear Plant, Units 1 and 2, Applicant response to the requirements of NUREG-0578 and NUREG-0737. This review found the Applicant provided an acceptable response reconfirming they met General Design Criteria 14, 15, and 30 of Appendix A to 10 CFR 50 for the subject equipment. It should also be noted Lockheed Idaho performed this review for both Units 1 and 2. However, the applicability of this review to Unit 2 depends on verifying that the Unit 2 as-built system conforms to the Unit 1 design reviewed in this report.},
doi = {10.2172/34323},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Feb 01 00:00:00 EST 1995},
month = {Wed Feb 01 00:00:00 EST 1995}
}

Technical Report:

Save / Share:
  • In the past, safety and relief valves installed in the primary coolant system of light water reactors have performed improperly. As a result, the authors of NUREG-0578 (TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations) and, subsequently, NUREG-0737 (Clarification of TMI Action Plan Requirements) recommended development and completion of programs to do two things. First, the programs should reevaluate the functional performance capabilities of pressurized water reactor safety, relief, and block valves. Second, they should verify the integrity of the pressurizer safety and relief valve piping systems for normal, transient, and accident conditions. This report documents the reviewmore » of those programs by EG&G Idaho, Inc. Specifically, this report documents the review of the Comanche Peak, Unit 2, Applicant response to the requirements of NUREG-0578 and NUREG-0737. This review found the Applicant provided an acceptable response reconfirming they met General Design Criteria 14, 15, and 30 of Appendix A to 10 CFR 50 for the subject equipment.« less
  • This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), and Supplement No. 9 (June 1992) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units I and 2 (Docketmore » Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER.« less
  • Supplement No. 8 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 7 was issued, and (2) matters that the staff had under review when Supplement No. 7 was issued.
  • Supplement No. 11 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 10 was issued, and (2) matters that the staff had under review when Supplement No. 10 was issued.
  • This report supplements the Safety Evaluation Report (SER), NUREG- 0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), and Supplement No. 8 (January 1992) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391).more » The facility is located in Rhea County, Tennessee near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER.« less