Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Tank farms justification for continued operations 007 Implementation Plan

Technical Report ·
DOI:https://doi.org/10.2172/326862· OSTI ID:326862
This Implementation Plan (IP) provides detailed descriptions, cost estimates, and schedules of activities required to implement the controls specified in Flammable Gas/Slurry Growth Unreviewed Safety Question: Justification for Continued Operation for the Tank Farms at Hanford Site (WHC-SD-WM-JCO-007, Rev.0). This IP complies with the Interim Operational Safety Requirements (IOSR) Administrative Control 5.27 and WHC-IP-0842 Volume 4 Section 5.6 for such a plan.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
326862
Report Number(s):
WHC-SD-WM-IMP--003; ON: DE98058196; BR: EW3120071; CNN: DE-AC06-96RL13200
Country of Publication:
United States
Language:
English

Similar Records

Safety basis for the 241-AN-107 mixer pump installation and caustic addition
Technical Report · Wed Oct 05 00:00:00 EDT 1994 · OSTI ID:10192397

A safety equipment list for rotary mode core sampling systems operation in single shell flammable gas tanks
Technical Report · Tue May 18 00:00:00 EDT 1999 · OSTI ID:782376

Safety basis For activities in double-shell tanks with flammable gas concerns
Technical Report · Sun Feb 04 23:00:00 EST 1996 · OSTI ID:492103