Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Tank 241-BY-107, Cores 151 and 161, Analytical Results for the 45 day report

Technical Report ·
DOI:https://doi.org/10.2172/326831· OSTI ID:326831
This document is the 45-day laboratory report for tank 241-BY-107. Push mode core segments were removed from risers 8 and 9B between June 5, 1996, and July 26, 1996. Segments were received and extruded at the 222-S Analytical Laboratory. Analyses were performed in accordance with Tank 241-BY-107 Push Mode Core Sampling and analysis Plan (TSAP) and the Safety Screening Data Quality Objective (DQO). None of the subsamples submitted for Total Alpha Activity (AT) analysis or Differential Scanning Calorimetry (DSC) exceeded the notification limits as stated in the DQO. Statistical evaluation of results by calculating the 95% upper confidence limit is not performed by the 222-S Laboratory and is not considered in this report. Primary safety screening results are included in the data summary table. The raw data from DSC and TGA analyses are included in this report.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
326831
Report Number(s):
WHC-SD-WM-DP--197; ON: DE98058479; BR: EW3120074
Country of Publication:
United States
Language:
English

Similar Records

Tank 241-AN-105, cores 152 and 153, analytical results for the 45 day report
Technical Report · Fri Sep 20 00:00:00 EDT 1996 · OSTI ID:326857

Tank 241-A-101, cores 154 and 156 analytical results for the 45 day report
Technical Report · Fri Oct 18 00:00:00 EDT 1996 · OSTI ID:332188

45-Day safety screening results for tank 241-U-102, push mode cores 143 and 144
Technical Report · Fri Jun 28 00:00:00 EDT 1996 · OSTI ID:328473