Engineering work plan tank farm lightning mitigation system

Technical Report ·
DOI:https://doi.org/10.2172/326404· OSTI ID:326404
This Engineering Work Plan defines the scope, function and design criteria, and installation activities that will be provided in support of the Tank Farm Lightning Mitigation System. The Tank Farm Lightning Mitigation System is comprised of two tasks, the light pole air terminal design and the tank riser bonding design. Air terminals, riser and riser flange bonding system will be designed and installed to mitigate the effect of lightning strikes in single shell tank farms with watchlist tanks.
Research Organization:
Fluor Daniel Hanford, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
326404
Report Number(s):
HNF-SD-WM-WP--339; ON: DE98059582; BR: EW3120072
Country of Publication:
United States
Language:
English

Similar Records

Probability, consequences, and mitigation for lightning strikes of Hanford high level waste tanks
Technical Report · Wed Jun 05 00:00:00 EDT 1996 · OSTI ID:662062

Probability, consequences, and mitigation for lightning strikes to Hanford site high-level waste tanks
Technical Report · Thu Aug 01 00:00:00 EDT 1996 · OSTI ID:658891

Engineering task plan for purged light system