Engineering work plan tank farm lightning mitigation system
This Engineering Work Plan defines the scope, function and design criteria, and installation activities that will be provided in support of the Tank Farm Lightning Mitigation System. The Tank Farm Lightning Mitigation System is comprised of two tasks, the light pole air terminal design and the tank riser bonding design. Air terminals, riser and riser flange bonding system will be designed and installed to mitigate the effect of lightning strikes in single shell tank farms with watchlist tanks.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 326404
- Report Number(s):
- HNF-SD-WM-WP--339; ON: DE98059582; BR: EW3120072
- Country of Publication:
- United States
- Language:
- English
Similar Records
Probability, consequences, and mitigation for lightning strikes of Hanford high level waste tanks
Probability, consequences, and mitigation for lightning strikes to Hanford site high-level waste tanks
Engineering task plan for purged light system
Technical Report
·
Wed Jun 05 00:00:00 EDT 1996
·
OSTI ID:662062
Probability, consequences, and mitigation for lightning strikes to Hanford site high-level waste tanks
Technical Report
·
Thu Aug 01 00:00:00 EDT 1996
·
OSTI ID:658891
Engineering task plan for purged light system
Technical Report
·
Tue May 11 00:00:00 EDT 1999
·
OSTI ID:782287